to move, Enter to open, Esc to close. Try 3.5.3, AC.L2-3.1.1, MFA or unmarked.

03.10.08Access Control for Transmission in Rev. 3

New in Revision 3 — no Revision 2 equivalent. Nothing in NIST SP 800-171 Rev. 2 maps onto this number, so it has no Rev. 2 page and no side-by-side; the Rev. 3 text is below in full.

Status as of 2026-09-08

Rev. 2 is what a contract requires today. DFARS 252.204-7012 and the CMMC rule at 32 CFR 170 point at NIST SP 800-171 Rev. 2, and a standing DoD class deviation keeps it there. NIST has published Rev. 3, but publishing a revision does not change an obligation. A move to Rev. 3 would arrive through the Department's reform process and formal rulemaking, a change to that deviation or an amendment to the rule, not through publication. The Department has published its organization-defined parameter values for Rev. 3 in preparation; that is groundwork, not adoption.

The requirement

Rev. 3 · not adopted 03.10.08 Access Control for Transmission

Control physical access to system distribution and transmission lines within organizational facilities.

NIST SP 800-171 Rev. 3, verbatim, with organization-defined blanks highlighted. Rev. 2 has no counterpart to place beside it.

Determination statements

What an assessor would check under NIST SP 800-171A Rev. 3. 1 statement, each one answered yes or no.

  1. 03.10.08 physical access to system distribution and transmission lines within organizational facilities is controlled.

NIST SP 800-171A Rev. 3, verbatim.

What NIST says

  • New security requirement based on PE-04 (SP 800-53, Revision 5)

NIST, SP 800-171 Rev. 2 to Rev. 3 change analysis, class “New requirement”. At adoption, Bedrock files this under “New”.

NIST's Rev. 3 discussion for 03.10.08

Safeguarding measures applied to system distribution and transmission lines prevent accidental damage, disruption, and physical tampering. Such measures may also be necessary to prevent eavesdropping or the modification of unencrypted transmissions. Safeguarding measures used to control physical access to system distribution and transmission lines include disconnected or locked spare jacks, locked wiring closets, cabling protection with conduit or cable trays, and wiretapping sensors.

Physical Protection in Rev. 3

The active PE requirements in Rev. 3. Those with a Rev. 2 predecessor link to that comparison; those marked new have their own page.

All Physical Protection requirements in Rev. 2

What this means for you now

Nothing. Until a class deviation or a published rule adopts Rev. 3, no assessor asks about 03.10.08 and SPRS has no score for it. If you already do what it describes, note where the evidence lives; that costs nothing and answers the question later.

Bedrock CMMC carries the Rev. 3 catalog beside your Rev. 2 package, so the day adoption lands the new requirements are a to-do list, not a surprise.

Where this page's facts come from
Rev. 3 03.10.08 text, determination statements, parameters, class and note
bedrock-cmmc-api@89b8e8e:docs/reference/nist-800-171-rev3/normalized/rev3.json#requirements[]